1, Customer RFQ |
Request for quotation with part drawings, samples or just concept. |
|
2, Quotation |
Issue a quotation within 3 working days. |
|
3, Order Confirmation |
Project kicks off upon receipt of deposit. |
|
4, Layout Assembly Drawing |
2 to 5 days for layout drawings. |
|
5, Detailed Design |
Mold components with detail drawings,include 2D 3D drawing. |
|
6, Drawings Final Confirmation |
Drawings are finally confirmed by customer. |
|
7, Schedule |
Follow up the schedule. |
|
8, Mold Manufacture on Schedule |
CNC Programming; CNC Machining; Wire Cut Processing; EDM Processing; Milling Processing; Mold Polishing, etc. |
|
9, Mold Trial Running |
Mould trial running on schedule. |
|
10, Samples Submitted |
Samples are submitted with a detailed inspection report. |
|
11, Sample Confirmation |
After inspected final samples according to specifications customer make a confirmation. |
|
12, Packing / Injection Molding |
Tooling finished and packed. / produce plastic products. |
| 13, Surface Treatment |
According to our customers requirements to adopt Spray Coating, Silk Screen Printing, Pad Printing, Hot Stamping, electroplating or Sub Assemblies. |
|
14, Delivery |
Paperwork and a CD of assembly drawings are sent to customer at the time of the shipment of the mould. / Consign the goods to customer. |
|
15, After Service |
Serving you at any moment. |